PROJECT:
▪ 11km of 28” x 0.750 underground pipeline.
▪ Pipeline: string; weld; external blasting & coating; ethafoam boxes; tie-ins; NDE.
▪ Civil: excavate ditch; backfill; berm; road maintenance.
▪ Crossings: Casing spacers; road sleeve installation.
▪ Vacu-lift was used for loading pipe from stock pile.
▪ Constructed on narrow RoW.
▪ Interface Management: operations; other contractors.