PROJECT – NWR Unit 10/20/30
Northwest Redwater Refinery (NWR) is located in sturgeon county. Bird Construction was awarded all work for undergrounds and foundations for Units 10, 20 & 30 who in turn subcontracted OCL Group to completed all associated piping. The Piping included Partially Contaminated Sewer System (PCSS), Oily Drainage System (ODS), & Fire Water System(FW).
▪ Install 4500 m and Weld 6000 Dia Inch of PCSS ranging 4”-30”.
▪ Install 5000 m and Weld 5200 Dia Inch of ODS ranging 4”-12”.
▪ Install 2400 m and Fuse 4600 Dia Inch of FW ranging 4”-8”.
▪ Coat/Wrap 11200 Dia of PCSS & ODS Ranging 4”-30”.
▪ Leak Test 5000 m of ODS ranging 4”-12”.
▪ Hydrotest 2400 m of FW Ranging 4”-8”.