HEAVY OIL PROJECTS 2018-08-09T02:50:41+00:00

Project Description

Heavy Oil Projects

Project Description:

A time sensitive scope to relocate two Dredges piping systems in new locations during plant outage. Increasing water elevations require the Dredge System piping to be moved to accommodate new raised elevation of new elevated Jetty.

Project Details

Project Description:

A time sensitive scope to extend the East West 48” Water Transfer line to accommodate the new location of the KID & KEP Barges.

Project Details

Project Description:

A time sensitive scope to relocate two (2) barges and associated piping.

Project Details

Project Description:

Syncrude Canada Limited’s (SCL) Intersite Corridor Relocation and Froth Line Replacement (ICRFLR) project was created to replace approximately 500m of 30” waterline and 1000m of 36” froth line located around and under the Peter Lougheed Bridge. The pipe is underground with the exception of the pipe located under the Peter Lougheed Bridge where it sits in external bays. Scope split over 2016 and 2017.

Project Details

Project Description:

This challenging CSA Z662 pipeline project required the installation of underground 36” piping through the heart of two operating oilsands plants.

Project Details

Project Description:

Suncor Fort Hills RAW Water Pipeline and Pumphouse supplies RAW Water to Suncor Fort Hills Facility from the Athabasca River. OCL was subcontracted by Bird Construction to install and test 800m of 30” Pipeline and 400m of 8” HDPE Gland Water Line.

Project Details

Project Description:

  • Pipeline corridor subgrade earth works and final grading
  • Installation of road crossings
  • Design, fabrication & installation of screw piling
  • Design, fabrication & installation of structural steel, anchors and guides
  • Double jointing of 26” x 0.750” piping
  • Fabrication and installation of 1866m – 26” x 0.750” NST 1 pipeline
  • Fabrication and installation of the 26” interconnecting process piping
  • Installation of HPU and expansion barrels
Project Details

Project Description:

  • Pipeline corridor earth works and final grading
  • Design, fabrication & installation of screw piling
  • Design, fabrication & installation of structural steel, anchors and guides
  • Double jointing of 26” x 0.750” piping
  • Fabrication and installation of 7500m – 26” x 0.750” NST 1 pipeline
  • Fabrication and installation of 1000m – 4” x 0.237” LDPD piping
  • Fabrication and installation of the 26” interconnecting process piping
  • Fabrication and installation of the 4” interconnecting process piping
  • Installation of expansion barrels
  • Electrical (EHT) and instrumentation work
  • Insulation & cladding
Project Details

Project Description:

The scope of work for the Tailings Train 2 Retrofit (TT2R) project included the fabrication and installation of a new 5300m of 18” Naptha Recovery Unit (NRU) pipeline, installation of a new pump house, installation of a new E- house, structural steel, mechanical and misc. piping

Project Details

Project Description:

  • Pipe strain and pre-commissioning of four (4) GIW Pumps – 21-G-4025, 21-G-4028, 21-G-5025 & 21-G-5028
  • Fabrication and installation of interconnecting Gland Watering & Drain piping
  • Fabrication and installation of the 28” interconnecting Process piping
  • Installation of two (2) hydraulic skid packages – 21-HP-4010 & 21-HP-5010 c/w stainless steel tubing
  • Design, fabrication and installation of structure steel rupture disc. platforms, anchors, guides, shoes and supports
  • Pipe strain and pre-commissioning of one (1) Surface Drainage Pump.
Project Details

Project Description:

  • Pipeline corridor subgrade earth works and final grading
  • Design, fabrication & installation of screw piling
  • Design, fabrication & installation of structural steel, anchors and guides
  • Double, triple & quad jointing of 26” x 0.750” piping
  • Fabrication and installation of 2200m – 26” x 0.750” NST 2 pipeline
  • Fabrication and installation of 1600m – 26” x 0.750” NST 5 pipeline
  • Fabrication and installation of 1200m – 18”x 0.500” NRU 3 pipeline
  • Fabrication and installation of the 26” interconnecting process piping
  • Fabrication and installation of the 18” interconnecting process piping
  • Installation of HPU and expansion barrels.
Project Details

Project Description:

Acting as the General Contractor OCL Group completed this multidiscipline project on time and on budget despite the challenging logistics involved in the onsite relocation of an existing pumphouse.

Project Details

Project Description:

  • Pipeline corridor subgrade earth works and final grading
  • Installation of berms and swales
  • Installation of road crossings
  • Design, fabrication & installation of screw piling
  • Design, fabrication & installation of structural steel, anchors and guides
  • Double, triple & quad jointing of 26” x 0.750” piping
  • Fabrication and installation of 2250m – 26” x 0.750” NST 3 pipeline
  • Fabrication and installation of 2250m – 26” x 0.750” NST 4 pipeline
  • Fabrication and installation of the 26” interconnecting Process piping
  • Installation of HPU and expansion barrels
Project Details