Slurry Line Prefab and Double Jointing

Client: CNRL Horizion Sustaining Capital

Approx. value: $3.8 Million


This was OCL's first project. The project consisted of double jointing of 30 kilometres of various sizes of pipe ranging from 26" to 30" heavy wall. As well as fabrication of components onto the pipe such as flanges, anchor rings and victaulic rings.

Services Provided