Enbridge Athabasca Terminal Suncor Bitumen Blending Project

Client: Enbridge

Approx. value: $12.5 Million


CWP 110 - Manifold 203:above ground piping,below ground piping,structural platforms, structural supports, installation and alignment of 2 x 450hp Booster Pumps coating and painting of all piping and structural,hydro-testing of all piping. CWP 510 - Connecting Lines,Underground 12" line x 250 meters,Underground 16" line x 250 meters,Coating of all piping, Risers and tie-ins to existing pig launchers.CWP 210 - Modification of Truck Unloading, Install 12" Hot Bitumen Insulated Line,Shutdown and tie-ins.

Services Provided